“You’re dealing with a foam block that wants to move around,” he says, “and the taller you go, the tougher it gets.” “The size and height of the walls was a challenge, but they went up smoothly.”Īlan Johnson, President of IMS Masonry, says the biggest challenge was making sure they had enough bracing and scaffolding to keep the walls perfectly straight. “Our overall experience was very good,” says Heath Holdaway, vice president of IMS Masonry. ![]() In total, the project used about 35,000 blocks.įor their outstanding work, they were awarded 2nd runner up in the heavy commercial category of the ICF Builder Awards. IMS stacked and poured all the walls in just over 5 months. Sahara Construction, working with IMS Masonry as the ICF installer, solved these problems using ICF construction. Designers also wanted maximum soundproofing and minimal energy bills. It was challenging for other reasons as well: Developers were on a tight time schedule, and the large wall surfaces-hundreds of feet long and more than 50 feet tall in places-needed to be completely straight. Some reach 52 feet high without intermediate floors. ![]() The largest ICF project completed to date, the Megaplex 20 theater in South Jordan, Utah, has more than 350,000 sq.
0 Comments
Leave a Reply. |